New Things 2024

Stairs This year, the board selected Universal Fibreglass for the replacement of aging metal stairs that build wood stairs covered in fibreglass, exactly the like ones they built three years ago...

Administration

Administration

Friday, 01 December 2017 10:46

Projects Completed 2017

Clubhouse

Because of years of water damage from ground water intrusion, the corporation decided to dig up the area around three sides of the Clubhouse foundation and waterproof the concrete walls. We also put in weeping tile and two sump pumps to keep the water out of this building.

The Corporation then redeveloped the basement interior by removing a hallway wall and opening up the environment to allow for more usable space. New bathrooms were designed to get rid of previous shower areas. By reconfiguring the bathrooms, we enlarged two storage areas.

Wednesday, 17 October 2018 13:26

Please Answer Our Poll

The board is trying to decide what to do with the tennis courts. Please select one of the following.

 

What should we do with the Tennis Courts
  • Votes: (0%)
  • Votes: (0%)
  • Votes: (0%)
  • Votes: (0%)
  • Votes: (0%)
Total Votes:
First Vote:
Last Vote:
Thursday, 23 November 2017 10:09

Southampton Green Reserve Fund Study

The following is the 2017 Southampton Green Reserve Fund Study. Use the link below to download this file.

Thursday, 25 May 2017 14:46

Anderson Road Widening

We have been informed by the City that they are planning a sound barrier wall to be put up on our property because of the noise coming off or Anderson Road, and the expected increase of noise because the the Ring Road that is now under construction. The images here show where the initial placement of that wall will be. The board will be in consultation with the City for finalized placement and construction if the board approves. We will update this page when we have new information to pass on. If you have concerns about this project, please contact us at contact@southamptongreen.com and title your email Anderson Road Widening.

Tuesday, 03 January 2017 10:05

Clubhouse Repairs

Update: The gym and bathrooms downstairs in the clubhouse are now open. The squash court is still under construction.

Friday, 09 December 2016 03:15

Heat Issues During Severe Winter Cold

During this time of extreme cold (-30 degree weather), the radiated heat system can only keep your unit at 18 - 20 degrees Celsius. This is normal and it means if your thermostat is set at 25, it will likely only warm to a maximum 20 degrees. If you require higher temperatures, you may need to wear additional layers of clothing or supplement the building heating system with an electric space heater (gas or other fuel sources are a fire hazard and against our bylaws).

To get the most out of the heating system:

  • ensure furniture, beds, drapes and other items are not blocking the heating system.
  • ensure the fireplace flue is in the closed position (when not in use) and cover the opening of the fireplace.

If you are concerned that your unit is not properly heated, before calling please check the radiant pipes. When warm or hot, they are likely working properly even though your unit may not be the temperature you desire. Please be aware that when you request a service call after-hours and the system is working properly, the unit owner is responsible for the after-hours plumber invoice.
 
If the radiant pipes are cold or fluid is seen leaking from the pipes, contact Simco Management immediately.*

During business hours: 403.234.0166 ext. 4022   (follow voicemail instructions if no answer)
After business hours: 403.230.4814
 
Stay warm everyone!
 
 
*Please note: thermostats and the heating systems are common property and are the responsibility of the Condominium Corporation, as outlined in our 1998 by-laws. Changes in any one unit can effect every resident in the building so authorized contractors must be used. Any owners making changes to thermostats or the radiant heating system in their unit are responsible for inspection and resulting repair costs by the Southampton Green Condominium Corporation’s authorized contractors.

Tuesday, 04 October 2016 04:01

Clubhouse Building Work

The clubhouse at Southampton Green downstairs area is shut down until which time renovations have completed. Also note that the southern area of the clubhouse will be going through repairs this October to stop water from entering the basement. Please be aware of any contractors in and around the clubhouse. Access to the laundry card system is still available. There may be a time in which it is not while the southern area is being dug up. Please keep your children away from the building during these renovations.

Tuesday, 05 July 2016 08:40

New Entry Door System

The Board of Directors, is pleased to announce the installation of a new intercom and fob system for Southampton Green.

The first phase of the project is to install a fob system on the clubhouse, to collect detailed information and to distribute 2 fobs to each unit at no cost. Owners will need to fill out forms that will be mailed out. If you do not get your package, you can log in to the owners area, download the forms, fill them out and present them with your picture ID on the dates below. Distribution of the fobs will take place in the clubhouse party room on:

  • Wednesday July 20, 2016 – 2pm – 5:30pm
  • Thursday July 21, 2016 – 2pm – 5:30 pm
  • Do not forget to bring your picture ID and completed paperwork with you
Sunday, 01 May 2016 15:03

2016 Projects

The board has approved many new projects for 2016. First of which is the replacement of all lower patio stone blocks changed over to poured cement pads. This project will take place over the summer. It is not yet confirmed that all main floor patios will be installed this year, but the hope is they will be. There maybe times when certain trees will be removed, or roots cut back to prevent heaving the of pads. The board will try to keep tree removal at a minimum as trees are what makes Southampton Green so special.

Thursday, 22 October 2015 00:23

Southampton is Going Even More Green

We would like to introduce residents to your new recycling service partner, BluPlanet Recycling Inc. Their bins look like this.

 3 yard bin

We will soon be setting up a new recycling program at sites around your complex. The sites are located where the pink dots appear on the image above, but before collection begins, here is some important information on what types of materials we recycle. BluPlanet Recycling will accept all of the following materials in our mixed materials bins:

 

  • Clean plastic containers with the recycling symbol 1 – 7 (Numbers can be located on the bottom of most plastic containers within a triangle shape)
  • Liquid detergent, fabric softener and shampoo bottles, plastic clamshell trays, yogurt and margarine containers.
  • Plastic bags and plastic wrap
  • Newspapers and paper inserts
  • Catalogues and magazines
  • Paper (e.g. letters, envelopes, greeting cards, brochures, non-foil gift wrap, paper bags)
  • Cardboard
  • Telephone books and paperback books
  • Shredded paper (put in plastic bags so that the paper does not blow around)
  • Clean metal food and beverage cans
  • Metal lids and caps
  • Clean aluminum foil, aluminum plates and containers

 

NO HOUSEHOLD GARBAGE IS ALLOWED IN THESE BINS. PLEASE USE GARBAGE BINS FOR THIS USE.

 

Clean jars and bottles and refundable beverage containers must be placed in separate bin provided. If the bin is not provided, then you should take your refundables to a recycling centre.

Please note that all of the above materials will be accepted for removal and can be placed into the mixed material bins, however, we request that all residents please visit our website at bprecycling.ca for more details on how to recycle using our program.

We look forward to working with you!

BluPlanetlogo

Page 2 of 4

Twitter

Where Are We

Print